Prime Cost Building Contract (PCC)

Only £200.00 + VAT

Current version: PCC 2016
Previous versions: PCC 2011, PCC 2006 (Revision 2 2009), PCC 1998

Click ‘Add to Basket’ to purchase a JCT On Demand digital version of this contract. If you would prefer a hardcopy version (i.e. a physical copy that is delivered to you), select ‘Hardcopy’ from the format box.

  • For use on projects requiring an early start on site. The works are designed by or on behalf of the employer but it is not possible to prepare full documents before the works commence.
  • Detailed provisions are necessary and the contract is administered by the architect or contract administrator and a quantity surveyor.
  • The contractor is paid for the Prime Cost of the Works plus a contract fee. Interim payments are paid on a monthly basis.
  • Provisions are included for collaborative working, sustainability, off-site materials bond, third party rights and collateral warranties.
  • This contract can be used with the Framework Agreement (FA).
  • For use on both private and public sector projects. 
  • Download contents page

About this type of contract

ISBN : 9780414058200

Edition : 2016

JCT Met Office Weather Reports