Contract Administration Model Forms
For use with the
Intermediate Building Contract 2016 (IC 2016)
and the
Intermediate Building Contract with contractor's design 2016 (ICD 2016)
Click ‘Add to Basket’ to purchase a JCT On Demand digital version of this contract.
WARNING – this document has been superseded. The date for the withdrawal of the JCT 2016 Edition has passed. This product is made available during a transitional period until 31 December 2026. See here for more details:
withdrawal of JCT 2016
Convenient and easy to purchase and access online, JCT's Contract Administration Model Forms provide a series of template forms to assist with the administration of a JCT contract and construction project.
This PDF pack is specifically for use with the Intermediate Building Contract (IC) and the Intermediate Building Contract with contractor's design (ICD) 2016.
The PDF pack includes the following model admin forms:
- Adjustment of Completion Date
- Practical Completion Certificate
- Section Completion Certificate
- Certificate of Non-Completion
- Notice of Intention to Require Payment of, Withhold or Deduct Liquidated Damages
- Notice to Require Payment of, Withhold or Deduct Liquidated Damages
- Notice to Partial Possession
- Certificate of Making Good
- Architect/Contract Administrator’s Instruction
- Statement of Reimbursement of Advance Payment
- Interim Certificate
- Pay Less Notice
- Final Certificate
- Valuation (which can be used with the Interim Certificate, Final Certificate and Pay Less Notice)
These model forms are designed to be used with a pdf writer if users wish to complete the forms electronically.
These model forms are intended to provide assistance in administering the contract but it is not a substitute for professional advice. Specific advice should be obtained on any issues that may arise.
Edition : 2016