Current edition: CM/TC 2016
Previous editions: CM/TC 2011, CM/TC 2008, TC/C 2002
Click ‘Add to Basket’ to purchase a JCT On Demand digital version of this contract. If you would prefer a hardcopy version (i.e. a physical copy that is delivered to you), select ‘Hardcopy’ from the format box.
WARNING – this document has been superseded. The date for the withdrawal of the JCT 2016 Edition has passed. Whenever possible, in the interest of best practice and legal compliance, it is recommended to use the JCT 2024 version of this contract.
This product is made available during a transitional period until 31 December 2026.
See here for more details:
withdrawal of JCT 2016
- This contract is for use between an employer and a trade contractor where a Construction Manager engaged under a Construction Management Appointment (CM/A) is managing the project and administering the conditions.
- The price of the contract is based on a lump sum or re-measurement with interim payments.
- Works can be carried out in sections.
- Provisions are included for collborative working, sustainability, advance payment, bonds (advance payment, off-site materials, retention), third party rights and collateral warranties.
- For use on both private and public sector projects.
- Pre-Construction Services Agreement (General Contractor) can be used with this contract.
- This contract can be used with the Framework Agreement (FA).
- Download contents page
About this type of contract
ISBN : 9780414058101
Edition : 2016