Current edition: FA 2016
Previous edition: FA 2011
Click ‘Add to Basket’ to purchase a JCT On Demand digital version of this contract. If you would prefer a hardcopy version (i.e. a physical copy that is delivered to you), select ‘Hardcopy’ from the format box.
WARNING – this document has been superseded. The date for the withdrawal of the JCT 2016 Edition has passed. Whenever possible, in the interest of best practice and legal compliance, it is recommended to use the JCT 2024 version of this contract.
This product is made available during a transitional period until 31 December 2026.
See here for more details:
withdrawal of JCT 2016
JCT’s Framework Agreement is designed for use by employers who procure work on a regular basis and want to capture the benefits of long-term relationships within the supply chain. It is often also suitable for use where a partnering or collaborative approach is desired on a project that might be more representative of another procurement method.
- It can be used for the procurement of works over a period of time
- It can be used not only between employers and their contractors/suppliers, but also by contractors, sub-contractors and suppliers who are sub-letting to others in the supply chain
- It can be used with most standard forms of construction contracts, engineering contracts, or sub-contracts
- It can be used where compliance with the public procurement rules is required
- It can be used just on a single project, where engendering a collaborative approach is desired
- Reference to public procurement in this document may be affected by Brexit. Click here for the related article.
- Download contents page
ISBN : 9780414058026
Edition : 2016